Rainbow Beach comes down to make way for Ocean Two.

Construction Add comments

The demolition of Rainbow Beach started just before Christmas to make way for Ocean Two. The site is being cleared and prepared for construction which is expected to begin on Febuary 1st, 2008.Rainbow Beach Hotel demolition Demolition of Rainbow Beach Hotel

One Response to “Rainbow Beach comes down to make way for Ocean Two.”

  1. ethan Says:

    an end to the great tony hoad era. his design for a multi-use corridor never duplicated anywhere else.
    it will be sadly missed.

Leave a Reply

You must be logged in to post a comment.

WP Theme & Icons by N.Design Studio
Entries RSS Comments RSS Log in